Parts & assembly sheet – Golden Lighting 6005-3P RBZ User Manual
Page 2
For Customer Service, contact the place of purchase to arrange for replacement parts.
7. Slip Canopy loop collar (H) over the chain, then do the
same with the canopy (G).
8. When ready to complete the installation, use the remaining
chain connector to attach the loose end of the chain to the
canopy loop (F). Close the chain connector.
9. Make sure the weight of the chandelier will be supported
by the chain - not the electrical wire.
* You may now install the fixture.
4. By measuring determine correct number of links needed
for proper hanging height. Use a pair of pliers to open one
link of the Chain (K) then remove the excess Chain (K) and
discard it.
5. Use one chain connector (L) to attach one end of the chain
to the Top Loop (J) and close the chain connector.
6. Feed the fixture wires through the Chain (every three links)
and pull the wires until taut.
Fig 2
Note: Complete these remaining steps after the fixture is
hung.
10. Thread the threaded rod/nipple (N) onto the socket
assembly coupler, and secure with a hex nut.
11. Install the light bulbs in accordance with the fixture's
specifications.
12. Slide the Glass shade (O) and Flat washer (P) over the
Nipple (N), and secure in place with the Hex nut (Q). Slide
the Bottom Cap (R) over the Nipple (N), and secure in place
with the Finial (S).
(DO NOT EXCEED MAXIMUM WATTAGE RATING)
Fig 3
PARTS & ASSEMBLY SHEET
Fixture Name: Lancaster 6005-3P PW/RBZ/AB
D
C
S
N
O
P
Q
R
D
C
S
N
O
P
Q
R
D
C
S
N
O
P
Q
R
6005-3PPartsInstallation_111004m.xls