beautypg.com

1089-chand-i, Installation instructions, Lb c a – Golden Lighting 1089-D5 RSB-PRL User Manual

Page 3

background image

For Customer Service, contact the place of purchase to arrange for replacement parts.

HANGING THE FIXTURE (Fig.1)

1. Carefully remove the new fixture from the carton and the yellow bag that

holds all your parts. Check that all parts are included as shown in the

illustrations and the Parts and Assembly Sheet.

2. Shut off the power at the circuit breaker and remove old fixture from ceiling,

including the old mounting strap.

3. Thread Nipple (C) into Canopy Loop (F) until snug.

4. Thread other end of the Nipple (C) with Canopy Loop attached into Mounting

Strap (D).

5. Place Lock Washer (B) over end of Nipple (C) protruding through Mounting

Strap (D) and thread Hex Nuts (A) onto Nipple until tight.

6. Take this mounting strap assembly and mount to ceiling junction box with

junction box Screws (E). Tighten screw securely with screw driver.

CONNECTING THE WIRES (Fig 2)

10. Attach the power supply wires to the fixture lead wires by connecting

BLACK to BLACK (or SMOOTH) and WHITE to WHITE (or RIBBED).

11. Attach the GROUND wire(GREEN or COPPER) from the Junction Box and

the fixture Ground wire to the green Ground Screw on the Mounting Bracket (D)

or connect both wires together using the correct size of wire connectors.

NOTE: Twist the wires together in the same direction you twist the wire

connector onto the wires.

12. Tuck these wire connections neatly into the Junction Box.

13. Raise Canopy (G) to the ceiling and secure in place by tightening the

Canopy loop collar(H) into the Canopy Loop(F)

14. Install the light bulbs and glass shade as per the fixture assembly sheet.

Fig. 2

YOUR INSTALLATION IS NOW COMPLETE.

RETURN POWER TO THE JUNCTION BOX

AND TEST THE FIXTURE.

Fig. 1

7. Unscrew Canopy Loop Collar (H) from the Canopy loop. Take the canopy

and pass over the Canopy loop. approximately one half of the canopy loop

exterior threads should be exposed. Adjust until desired height is reached. *the

Canopy loop collar should fit snugly on the Canopy loop after the canopy is

installed. Remove Canopy and Canopy lock collar.

8. Assemble the fixture and have an assistant or secure support hold the weight

of the fixture while you complete the wiring connections.

9. Thread the fixture wires and ground wire of the assembled fixture through the

canopy loop and nipple and into the outlet box.

For Chandelier Light Fixture

INSTALLATION INSTRUCTIONS

WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.

Fixture Name: Pemberly Court 1089-D5 RSB-PRL

L

B

C

A

JUNCTION BOX
(CEILING)

D

E
F

H

J

CHAIN

G

BARE COPPER

(Ground)

GREEN
(Ground)

FIXTURE WIRES

SMOOTH (BLACK)

RIBBED (WHITE)

BLACK

WHITE

HOUSE WIRES