beautypg.com

Installation instructions – Golden Lighting 1051-SF SBZ User Manual

Page 2

background image

For Semi Flush Light Fixture

INSTALLATION INSTRUCTIONS

WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.

Fixture Name: Hidalgo 1051-SF SBZ

Fig. 1

Fig. 2

For Customer Service, contact the place of purchase to arrange for replacement parts.

HANGING THE FIXTURE as Semi flush (Fig. 1)
1. Carefully remove the new fixture from the carton and the
yellow bag that holds all your parts. Check that all parts are
included as shown in the illustration and parts list.
2. Shut off power at the circuit breaker and remove the old
fixture from ceiling, including the old mounting strap.
3. The Circular Mounting Strap (A) contains several pairs of
threaded holes, find the pair of holes that match the hole
spacing in your fixture Back Plate (D) and thread the two
Mounting Screws (C) half way into the Mounting Strap (A)
facing down,Secure in place with hex nuts. These will have
their threaded ends protrude through the two holes in the
fixture canopy (D).
4. Place the Mounting Strap (A) over the junction box.
5. Attach the Mounting Strap (A) to the Junction Box using
the two mounting screws (B). Tighten the screws (B)
securely with screw driver.

CONNECTING THE WIRES (Fig 2)
6. Attach the power supply wires to the fixture lead wires
by connecting BLACK to BLACK (or SMOOTH) and
WHITE to WHITE (or RIBBED).
7. Attach the GROUND wire(GREEN or COPPER) from the
Junction Box and the fixture Ground wire to the green
Ground Screw on the Mounting Bracket (A) or connect
both wires together using the correct size of wire
connectors.
NOTE:Twist the wires together in the same direction you
twist the wire connector onto the wires.
8. Tuck these wire connections neatly into the Junction
Box.

FINISHING THE INSALLATION (Fig.3)

9. Place the fixture’s canopy over the Mounting Strap (A)

and over the Mounting Screws (C), adjust the fixture

canopy (D) until the Mounting Screws (C) protrude out from

the canopy (D) and secure the fixture against the ceiling by

threading the decorative nuts (E) until tight.

10. Install the light bulbs and glass shade as per the fixture

assembly sheet.

YOUR INSTALLATION IS NOW COMPLETE. RETURN

POWER TO THE JUNCTION BOX AND TEST THE

FIXTURE.

Fig. 3