EDCO 2GC-NG-11H User Manual
Page 6

E-2ECGCNG-I-0513
Printed in USA
©2013
Page 6
100 Thomas Johnson Drive, Frederick, MD 21702-4600 USA
Phone (301) 663-1600 • 1-800-638-3326
Fax (301) 663-1607 • 1-800-447-3326
Website: www.edcoinc.com • Email: [email protected]
2. Begin the leveling process -
With the machine in the upright position release the level lock locking lever.
Rock the machine back and forth until the bubble level in centered.
This gets the machine close to the proper operating position.
This manual is related to the following products: