beautypg.com

Maintenance schedule – EDCO 2GC-NG-11H User Manual

Page 15

background image

E-2ECGCNG-I-0513

Printed in USA

©2013

Page 15

100 Thomas Johnson Drive, Frederick, MD 21702-4600 USA

Phone (301) 663-1600 • 1-800-638-3326

Fax (301) 663-1607 • 1-800-447-3326

Website: www.edcoinc.com • Email: [email protected]

Maintenance Schedule

Visual Inspection of

Entire Machine

Check Engine Oil*

Change Engine Oil*

(refer to Engine manual)

Clean Air Filter Element*

Grease Bearings

Inspect Drive Belts

Inspect Grinding Discs

Clean Air Filter Element*

Belt Tensioning

Clean Dust & Dirt

Off machine

Before Operation

Every 4 Hours

Daily

Every 50 Hours

of Operation

As Required

X

X

X
X

X

X

X

X

* Gasoline and Propane Models only

X

X

Repairs are to be performed

by approved EDCO repair

technicians.

Read and follow all instructions

in the Engine Manufacturer’s

Owner’s manual.

This manual is related to the following products: