Pl-40s – D.A.S. Audio Aero 40A Rigging User Manual
Page 4

4
Manual de Colgado
/
aero
40 / Rigging Manual
Three or four units groups are easy to transport
by truck as we will see in this section. We will also
see the preparation.
Remove the front
PL-40 pushing the triggers at
the same time. Hold the carriage before acting
on the triggers. The triggers are situated on both
sides of the enclosure.
This will be the first enclosure that we will stack
onto the
PL-40S.
If we look at the platform we will see the two
security pins on the sides (see figure).
These pins allow to hold the first enclosure to
the platform.
PL-40S
Side view of the
PL-40S platform.
Front part of the
PL-40S platform.
Rear part of the
PL-40S platform.
Security pins on
the
PL-40S platform side.
Security pins of the
PL-40S platform.
Front view of the
PL-40S platform.
4 UNITS MOUNTING ON A
PL-40S
- Aero 12 (15 pages)
- Aero 20A (18 pages)
- AX-Aero40S2 (2 pages)
- AXU-VA24 (1 page)
- AXU-VA4 (1 page)
- AXW-3 (2 pages)
- DASnet Splitter (12 pages)
- DASnet V1.5 (70 pages)
- Event series (19 pages)
- DAS Loader V1.1 (13 pages)
- VA Systems (15 pages)
- WR Systems (18 pages)
- Convert 15A series (22 pages)
- Convert 15A series Rigging (20 pages)
- Aero 40A (21 pages)
- AXU-WR6412 (2 pages)
- AXU-WR6415 (2 pages)
- LX-218A (18 pages)
- Aero 28 Series (28 pages)
- ST Series (24 pages)
- Compact Series (44 pages)
- SM Series (24 pages)
- Variant Series Systems Guide (14 pages)
- CSA Series (32 pages)
- SLA Series (28 pages)
- H Series (24 pages)
- PS Series (28 pages)
- Energy Series (28 pages)
- DSP-26 (48 pages)
- Sub-18HA (24 pages)
- Rf Series (24 pages)
- Artec Series (2 pages)
- Pf Series (2 pages)
- MI Series (2 pages)
- DR Active Series (20 pages)
- DR Series (2 pages)
- Factor Series (2 pages)
- Arco 12 Sub (2 pages)
- Arco Series (2 pages)
- CL Series (24 pages)
- Bidriver Plus (1 page)
- Aero 38A (26 pages)
- Avant Series (26 pages)
- DSP-48 (28 pages)