Site preparation – Hardy Advantage HI LPRC03 Load Point User Manual
Page 8
![background image](/manuals/657651/8/background.png)
HI HLPRC03 SERIES LOAD POINT ASSEMBLY
Page 2
LOAD SENSOR CERTIFICATION SHEETS ARE
AVAILABLE 24 HOURS A DAY AT OUR WEB-
SITE: http://www.hardinst.com. Go to “Products” or
“Support,” click Advantage Load Sensor Tool/Certi-
fication, then follow directions.
Note the serial number(s) for reference when talking
to Hardy Customer Service. Store this information in
a safe location for future reference.
Site Preparation
As foundations for the load point assemblies, use a
metal base plate that will not be deformed when you
weld it to the bottom plate of the load point.
•
Check the I/I diagrams that come with this docu-
ment for the assembly’s dimensions. (They are
also available on the Hardy Instruments Web Site
(http://www.hardyinst.com ).
•
All mounting surfaces for the base and loading
plate must be level. Load Point Assemblies must
be level to within 0.4/100 for legal or trade appli-
cations or 0.8/100 for general applications.
•
Complete all welding before installing the load
sensor.
Basic Engineering
Principles for
Positioning Load
Point Assemblies
Note the following requirements when positioning the
Load Point.
•
Position the Load Point Assemblies to distribute
the load (weight) as evenly as possible between
each load point assembly in the scale.
•
When the installation does not allow even load
distribution, select higher capacity load point
assemblies.
•
All load point assemblies must have the same
capacity when used in one scale.