beautypg.com

5putting into operation – BUCHI UV-Vis Detector C-640 User Manual

Page 23

background image

5 Putting into operation

23

C-640 Operation Manual, Version A

5

Putting into operation

This chapter describes how the instrument has to be installed. It also gives instructions for the initial
startup.

NOTE
Inspect the instrument for damages during unpacking. If necessary, prepare a status report imme-
diately to inform the postal company, railway company or transportation company. Keep the original
packaging for future transportation.

5 .1

Installation site

Put the instrument on a stable, horizontal surface. Consider the maximum product dimensions and
weight. We recommend the installation into the chromatography table. Obtain the environmental
conditions as described in section 3.4 “Technical specifications”.

!

Warning

Death or serious injuries by use in explosive environments.
• Do not operate the instrument in explosive environments.

!

Warning

Death or serious poisoning by contact or incorporation of harmful substances.
• Wear safety goggles.
• Wear safety gloves.
• Wear a laboratory coat.
• Clean the instrument and all accessories thoroughly to remove possibly dangerous

substances.

• Do not clean dusty parts with compressed air.
• Store the instrument and its accessories at a dry place in its original packaging.