BUCHI Syncor Polyvap User Manual
Page 16
Syncore
Platform
16
4 Putting into Operation
Figure 10: Attachment of the condenser unit
4.6 Attachment of the condenser unit S and C
• Screw the right- or left-hand support rod (depen ding
on the work-place or the working procedure) into the hole
provided in the rear feet.
• Secure the cooler bracket (shackle) to the support rod
using the cross sleeve .
• Secure the cooler to the shackle.
• Attach the transition piece to the cooler with the clamp
.
• Also secure the receiving vessel to the transition piece
with the clamp .
• Fasten the cold water supply to the connection units
and using GL14 screwed fittings.
• Join the connection element to the valve unit with a
GL 14 sealing cap .
It is strongly recommend to secure all hose connections by
hose clips.
Figure 11: Cooler connections