beautypg.com

Bradford White U-65T-55FR-3N User Manual

Page 25

background image

Step 1.

Turn off water supply to water heater. Rotate gas control knob to the “OFF” position.

Step 2.

Turn off cold water supply to heater. Connect hose to drain spigot of water heater and route to an open drain.

Open a nearby hot water faucet to vent heater for draining. Open drain spigot of hot water heater and allow

heater to drain to a point below the outlet connection nipple.

Step 3.

Disconnect outlet nipple from plumbing system.

Step 4

With an appropriate wrench, remove outlet nipple/anode from the water heater. Use caution not to damage

pipe threads.

Step 5.

Visually Inspect outlet nipple/anode. Outlet nipple/anode should show signs of depletion, this is normal.

If depletion is ½ of the original anode diameter (approximately ¾” diameter), replacement is recommended.

If any of thesteel core of the anode is exposed, replacement is recommended.

Step 6.

Upon completion of inspection or subsequent replacement, reinstall outlet nipple/anode into heater. Connect

nipple to plumbing system, resume water supply and refill heater with water.

Step 7.

To resume operation, follow the instructions located on the lighting instruction label or the lighting

instructions located in the installation and operation manual.

ANODE INSPECTION AND REPLACEMENT

SERVICE PROCEDURE ED-IX

Dip Tube and Anode

Inspection and Replacement

WARNING

Heater components and stored water may be HOT when performing the following steps in

this procedure. Take necessary precaution to prevent personal injury.

Page 25

Gas Control Knob Shown In

“OFF” Position

25