A b a b – Workrite Sierra Assembly Instructions for 3-leg Workcenters User Manual
Page 7
Workrite Ergonomics | 800.959.9675 www.workriteergo.com
7
Sierra Series Workcenters - Assembly Instructions for 2 and 3-leg Tables
Connect Leg Cables to Control Box
If provided, use extension cable(s) for the leg(s) farthest from the control box.
Insert the leg cables into the 6-inch control box cables and then into terminals labeled M1, M2 and
M3. For 2-Leg tables, DO NOT USE terminal M3.
Insert the blue switch cable into the terminal labeled HS.
M1
M2
M3
a
b
c
a
b
c
3-Leg tables only!
Do NOT use this
terminal (M3) for
2-Leg tables.
Never connect or remove leg
or switch cables to or from
control box when power is
connected! Doing so will
damage control box.
8
Connect Power to Control Box and put Workcenter upright
Connect the electrical cable to the control box.
Turn the table over into an upright position.
Plug the electrical cable into the power outlet.
9
a
b
a
b
M
L
G
G
c
c
O