Inspection and start-up checklists 检查和启动检查清单, Receiving and inspecting 接收和检查 – Wine Guardian Ducted Wine Cellar Cooling Systems (WG175) - Manual User Manual
Page 62

58
Inspection and Start-up Checklists
检查和启动检查清单
Receiving and Inspecting 接收和检查
Unit received undamaged 完整无损地器材单元接受
Unit received complete as ordered including accessories 收到完整的器材包括附件
Handling and Installing 搬运和安装
Unit mounted on solid level surface 装置安装在坚实平坦的表面
Sufficient space allowed for access to unit and accessories
Proper electrical service
provided 设备周围有足够的空间,电力供应正确
Hot water provided to humidifier 加湿机热水供应
Drain lines and trap installed properly 排水管线和安装正确的陷阱
Ductwork, fittings and grilles installed properly 管道,配件及格栅正确安装
All cold duct surfaces insulated 所有冷风管道表面绝缘
Low ambient control included if freezing condition present
No obstructions to air flow to condenser
低温环境控制考虑到冰冻状态,冷凝器空气 流动没有障碍物干扰。
Starting-up the Unit 启动主机
General visual inspection looks good All wiring connections checked 一般目视检查过关 所
有线路连接检查过关
All ducts, grilles and panels in place 通风管道,格栅和盖板全部到位道。
Start unit 启动主机
Check ducts and connections for air leaks 检查管道和连接处空气泄漏
Balance air distribution 平衡空气分布
Confirm condenser airflow is unrestricted 确认冷凝器气流不受限制
Verify cooling and heating operation 检查冷却和加热操作
Check for excessive noise or vibration 检查噪音或震动过大