Figure 5-1. shunt locations, 8tuffseal installation guide – Rice Lake JB8SPT TuffSeal Signal Trim Junction Box User Manual
Page 12

+1
53*.
53*.
&9
&9
4*
&9
&9
4*
&9
&9
4*
&9
&9
4*
+1
+1
4*(/"-
4&$5
&"$)6/64&%4&$5*0/
4*(/"-
$&--
$&--
$&--
4)%
4)%
4*
4*
4)%
4*
4*
4)%
4*(/"-
4&$5
$&--
$&--
4*(/"-
4*(/"-
4*(/"-
$
,
$
3*$&-",&8&*()*/(4:45&.4
$&--
4&$5
$&--
+1
&9
&9
4*
&9
&9
4*
+1
&9
&9
4*
&9
&9
4*
4&$5
4*(/"-
53*.
53*.
53*.
53*.
53*.
53*.
"TTFNCMZ
&9
&9
&9
4*
4)%
4)%
4*
4*
4*
4)%
4*
4)%
$0//&$5#05)4)6/54
50"11-:$&--4*(/"-
4*(/"-
4*(/"-
4*(/"-
$&--
1/3FW
4*
4*
4*
3&.07&4)6/550%*4$0//&$5
4&$5
563/105$-0$,8*4&
'03."9*.6.4*(/"-
4&/
4)%
4&/
4)%
%*4$0//&$5#05)4)6/54
503&.07&$&--4*(/"-
&9
4&/
4&/
$6553"$&50*40-"5&4&/4&-*/&
3
3
3
+1
+1
+1
3
3
3
3
3
3
+1
+1
+1
3
+1
+1
3
3
3
2
3
+1
3
3
+1
3
3
3
3
3
3
3
3
3
3
3
3
3
+1
+1
73
+1
3
73
+1
3
3
3
3
3
3
73
3
2
73
3
3
73
3
3
3
3
3
3
3
3
3
73
3
+1
+.1/&(
+.1104
73
73
73
73
73
+
73
+
3
&91"/4*0/+
+
"3$
+1
+1
"3(/%
+1
*0
+1
-
-
-
+
*
+
+
-
*
*/%*$"503+
+1
53*.
&9
&9
+1
+1
4*(/"-
4)%
4*(/"-
4*(/"-
$&--
+1
&9
&9
53*.
4)%
$0//&$5#05)4)6/54
50"11-:$&--4*(/"-
4*(/"-
$&--
%*4$0//&$5#05)4)6/54
503&.07&$&--4*(/"-
3
3
+1
3
3
3
3
2
3
73
73
*0
+
+
8
TuffSeal Installation Guide
Figure 5-1. Shunt Locations
7. Pull excess cable out of the enclosure.
8. Using a wrench, tighten nut until the rubber touches the cable completely.
9. Then tighten the nut an additional 1/2 turn (180
º
). To be watertight, each cord grip must be tightened so
the rubber sleeve begins to protrude from the hub.
10. Unused hubs must be properly plugged to prevent moisture entry. Extra hole plugs are provided to seal
up any unused hubs.
11. Remove the desiccant from the plastic bag, and insert the desiccant bag into the junction box before
closing. Inspect the desiccant during normal service and change desiccant as needed.
12. Replace the cover and torque the cover screws in an alternating pattern to 15 in/lb to be certain the gasket
is compressed equally in all locations.