Home Legend Hardwood and Bamboo T-molding User Manual
Page 8

Doc.ID: 120
Effective: 2-18-2013
Title: Installation Hardwood/Bamboo Hard Surface Reducer
Rev.:0
Step 5.
Allow the glue to cure. Follow glue manufacturer’s recommendation.
Step 6.
Installation is complete and the floor can be placed in service.
Step 7.
Prevent damage. When moving heavy object across the hard surface reducer, do not drag the heavy object
across the top of it. Place plywood board over it and roll the object on the plywood.