beautypg.com

ETS-Lindgren 5503 Electric Field Generator User Manual

Page 34

background image

34

|

Operation

M

ODEL

5503-5M

P

OWER

R

EQUIREMENTS

,

100 V/M

Storage

The Model 5503 provides convenient storage when testing is complete.

1.

Disconnect all cables, including those that attach the antenna elements
to the load box and balun box.

2.

Remove the bolts that connect the elements to the U-shaped brackets.

3.

Disconnect the grounding plates.

4.

Roll the two sections of the support structure and carry the elements to
the storage location.