EFCO S5600 Slope Glazed User Manual
Page 5
EFCO CORPORATION 6/2012 PART NO. Y308
Page 5 of 23
Series 5600 Slope Glazed Curtain Wall Installation Instructions
[FIG. 1]
[FIG. 2]
Section II: Gutter and Mullion Assembly
Gutter and Mullion Assembly
A.)
Insert the transition anchor in top of 5600
wall vertical mullion using (4) #14 flat
head countersunk screws. (Ref. Fig. #1)
B.)
At extreme jamb members attach .062
aluminum end cap to top of mullion with
(2) #8 countersunk screws. Line up end
cap as shown below. (Ref. Fig. #3)
C.)
Prior to setting clip assembly, clean all
metal surfaces and lay in a bed of silicone
sealant at clip location. Set washers in
silicone sealant on top of gutter clip.
Insert 3/8” diameter bolts through flat
washer, gutter clip, transition gutter and
secure to transition anchor as shown.
(Ref. Fig. #1 & #2)
D.)
Seal over bolt heads & washers then tool
excess sealant around perimeter edge of
gutter clip to insure proper seal.
Bed of sealant
at clip locations.
Transition gutter
Transition anchor
3/8” Diameter bolts & flat washers
Typical 5600
curtain wall
mullion.
(4) #14 countersunk
screws per anchor.
Tooled sealant.
Gutter clip, sized
and cut per job.
Note: Primer may be needed on mill
finish material, consult sealant
manufacturer.