BoonDocker SKI-DOO: 2011-12 XP E-TEC 800 User Manual
Page 5
![background image](/manuals/635133/5/background.png)
BoonDocker tollfree: 877-522-7805 local: 208-542-4411 fax: 208-524-7381 www.boondockers.com 5
19. Plug the BoonDocker Power Harness into the Power
Adaptor and run the harness behind the fuel tank
next to the throttle bodies. Run all the the previously
installed harnesses to the front of the chassis inline
with the factory harness are shown above.
20. Install the throttle body adaptors onto the throttle
bodies with keeper tabs. The tabs should be installed
on the throttle bodies 180 degrees apart at approxi-
mately clock positions 10 and 4.
21. Install the Torque Tubes onto the throttle body adap-
tors and connect the the auxilliary injector connectors
from the Injector Harness into the auxilliary injectors.
22. Install the Torque Tube Y-Pipe onto the Torque Tubes.
23. Remove the center coolant line from the coolant re-
servior bottle and re-route to inside coolant barb on
the turbo. Install the outside turbo coolant line onto
the center fitting on the coolant bottle. Ensure that
the coolant line routing is clear of the pipe and other
hazards.
24. Before installing the turbo mount the Boost Solenoid
to the plastic bracket between the coolant lines.