BoonDocker SKI-DOO: 2013-14 XM E-TEC 800 User Manual
Page 9
Revised 12/28/2012
Page 9 of 10
www.boondockers.com……………….....
……….………………....877-522-7805
43.Check for clearance on the clutch cover & on
the head light to 3” charge tube. Tighten all air
box & charge tube hose clamps.
44.Install Tial muffler. NOTE when installing
the muffler rotate the top of the can to the inside
of the snow machine for a equal clearance to
both the side panel, chain case & stock oil tank.
45.Cut & remove the stock heat tape/insulation
from the side panel & install the heat tape as
seen in the picture.
46.Cut the shroud just enough to run control box
wiring & boost reference line through this area.
Zip tie wires as needed to hold wires & boost
line.
47.Turn handle bars all the way to the left &
install the cold air intake as seen in picture to fit.
48.Install the hose from boost solenoid headed
forward to the intercooler.