Figure 3-5: suretest controls, Powering the equipment, Suretest base unit controls – CDI Torque SURETEST AND 600TL Torque Calibration System User Manual
Page 26

SETUP AND PROGRAMMING
CHAPTER 3
SURETEST Base Unit Controls
Refer to the illustration below when performing the power-up and programming procedures.
Figure 3-5: SURETEST Controls
– SURETEST Graphic Display
–
Power
Switch
– Front Panel Membrane Function Keys
Powering the Equipment
To power the equipment, press the power button on the front of the SURETEST.
• At POWER ON, the SURETEST performs a self-test and momentarily displays the results on
the display.
• With no transducer installed, the display then reads:
pplying power with the transducer connected, or when connecting a transducer while the
• When a
power is on, the display momentarily reads:
Zerotare prompt
3-3