beautypg.com

Salter Brecknell 200ES User Manual

Page 36

background image

8-1

CHAPTER 8: LEGAL FOR TRADE SEALING

8.1 ABS

ENCLOSURE

Indicators in the ABS enclosure can be sealed for commercial (Legal for Trade) applications as
follows.

1.

Power off the indicator.

2.

On the back of the indicator, locate the setup/calibration switch cover (see illustrations

below).

3.

Thread a wire security seal through both drilled head screws securing the calibration

switch cover as well as the single drilled head screw holding on the rear panel.

Power Switch

DC Jack

RS 232

Port

LOAD CELL

Setup/Calibration

Switch

Figure 8-1: 200 and 200E ABS Rear Panel

DC Jack

Serial

Port

LOAD CELL

Setup/Calibration Switch

Port

Figure 8-1a: 200BW ABS Rear Panel



8.2

STAINLESS STEEL ENCLOSURE

Indicators in the stainless steel enclosure can be sealed for commercial (Legal for Trade)
applications as follows.

1. Power off the indicator.

2. On the rear cover of the indicator, locate the calibration switch cover.

3. Thread a wire security seal through both drilled head screws securing the calibration switch cover

as well as the two drilled head screws holding on the rear panel.



Older units

1.

Power off the indicator.

2.

Locate the two adjacent drilled head screws securing the rear cover.

3.

Thread a wire security seal through two drilled head screws securing the rear cover.

This manual is related to the following products: