Top installation and removal – Craftsman 706.596690 User Manual
Page 18
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
TOP INSTALLATION AND REMOVAL
Tools Required:
Screwdriver, Crosstip
Roll-away top removal
• Disconnect power from unit.
• Remove pull out work surface. (See
drawer and work surface installation
and removal.)
• Remove enough drawers to reach the
top back inside of the unit. (See
Drawer and Work surface installation
and removal.)
• Remove lock retaining clip. Pull lock
out to remove.
• Remove (4) screws holding top in
place.
• Lift top off of unit enough to reach the
wiring harness.
• Disconnect wiring harness from unit.
• Remove top from unit.
Roll-away top installation
• Connect wiring harness to top.
Position top on unit. Attach using (4)
screws.
• Position lock in unit. Install retaining
clip to hold lock in place.
• Make sure the back of the lock rod is
inserted into the lock rod holder in the
back of the unit.
• Push the lock rod toward the back of
unit the and line up with lock. Insert
the lock rod into the back of the lock.
• Test lock operation.
• Reinstall drawers.
• Reinstall work surface.
• Reconnect power to the unit.