Sfps, Unpacking and installing the fc san module – Dell POWEREDGE M1000E User Manual
Page 13
Dell 8/4Gbps FC SAN Module Hardware User’s Manual
11
53-1001964-01
Unpacking and installing the FC SAN Module
1
SFPs
NOTE
You must install Dell-supported SFPs in the FC SAN Module.
The FC SAN Module was designed to work with small form-factor pluggable (SFP) optical modules.
The FC SAN Module ships with two 8 Gbps SFPs installed. If you purchase a license for additional
ports, you will receive additional SFPs.
NOTE
You can also install 4 Gbps SFPs in the FC SAN Module, All SFPs must be Dell-supported.
SFPs provide optical connections to external devices for both SWL and LWL connections. Replace
SFPs with a new pluggable unit rather than replacing the FC SAN Module. Refer to the
manufacturer’s instructions when installing SFPs.
“Removing and replacing the FC SAN Module”
on page 24 provides details about removing SFPs
from the FC SAN Module.
Unpacking and installing the FC SAN Module
If the FC SAN Module is installed in the Blade Enclosure that is shipped to you, skip this section.
This section applies when installing a new module in an empty bay or replacing an existing FC SAN
Module.
NOTE
The FC SAN Module is designed to work only in I/O bays B1/B2 and C1/C2 of the Dell M1000e Blade
Enclosure. Make sure to comply with installation requirements in the Blade Enclosure Hardware
Owner’s Manual.
Perform the following steps to remove the FC SAN Module from its shipping package.
1. Open the shipping box and inspect the contents, making sure that nothing is missing or
damaged.
Do not insert a damaged FC SAN Module into the Blade Enclosure. If the FC SAN Module
appears to be damaged, contact your sales representative before proceeding.
2. Remove the cardboard accessory tray from on top of the FC SAN Module.
This tray contains the documentation, regulatory statements, product information guide, and
Documentation CD.
3. Remove the FC SAN Module from the box.
The protective foam ends will slide out with the FC SAN Module.
4. Remove the foam ends from the FC SAN Module.
5. Be sure that you have taken the necessary precautions for electrostatic sensitivity; then break
the seal warning.
6. Slide the FC SAN Module out of the antistatic sleeve and inspect it carefully for any obvious
defects or shipping damage.