Figures – Dell PowerVault 745N User Manual
Page 4
4
Contents
Figures
Figure 1.
RapidRails Rack Kit Contents
. . . . . . . . . . . .
8
Figure 2.
VersaRails Rack Kit Contents
. . . . . . . . . . . .
8
Figure 3.
One Rack Unit
. . . . . . . . . . . . . . . . . .
10
Figure 4.
Marking the Vertical Rails
. . . . . . . . . . . .
11
Figure 5.
Installing the RapidRails Slide Assemblies
. . . . .
12
Figure 6.
Installing the VersaRails Slide Assemblies
. . . . .
13
Figure 7.
Installing the System in the Rack
(RapidRails or VersaRails)
. . . . . . . . . . . .
15
Figure 8.
Installing the Cable-Management Arm
. . . . . .
16
Figure 9.
Opening the Wire Covers
. . . . . . . . . . . . .
17
Figure 10.
Installing the Power Cord Strain Relief
. . . . . .
18
Figure 11.
Routing Cables
. . . . . . . . . . . . . . . . . .
19
Figure 12.
Two-Post Rack Kit Components
. . . . . . . . . .
21
Figure 13.
Two-Post, Open-Frame Relay Rack
Universal-Hole Spacing
. . . . . . . . . . . . .
22
Figure 14.
Two-Post, Open-Frame Relay Rack
Wide-Hole Spacing
. . . . . . . . . . . . . . .
22
Figure 15.
Installing the Slide Assemblies for
Center-Mount Configuration
. . . . . . . . . . .
24
Figure 16.
Installing the Stiffening Bracket
(shown in 3-inch rack position)
. . . . . . . . . .
25
Figure 17.
Rotating the Front Mounting Bracket for
Flush-Mount Installation
. . . . . . . . . . . . .
26
Figure 18.
Installing the Slide Assemblies for
Flush-Mount Configuration
. . . . . . . . . . . .
27