Ames Fire & Waterworks A200 Bronze Anti-Siphon Pressure Vacuum Breakers User Manual
Series a200, Installation, maintenance, & repair, Installation requirements

RP/IS-A-A200
A200
3
⁄
4
" (20mm)**
A200
3
⁄
4
" – 1" (20-25mm)** has tee handles
1
1
⁄
4
" – 2" (32 – 50mm)**
Installation, Maintenance, & Repair
Series A200
Pressure Vacuum Breakers
Sizes:
3
⁄
4
" – 2" (20 – 50mm)**
www.amesfirewater.com
A Division of Watts Water Technologies, Inc.
Testing
For field testing procedure, refer to Ames installation sheets
IS-A-ATG-1 found on
www.amesfirewater.com.
For other repair kits and service parts, refer to our Backflow
Prevention Products Repair Kits & Service Parts price list
PL-A-RP-BPD found on
www.amesfirewater.com.
For technical assistance, contact your local Ames representative.
1. Install 12" (300mm) above highest point of downstream piping.
2. Install bonnet side up and allow for accessibility for testing /service.
3. Install where discharge or spillage is not objectionable.
4. Do not undersize supply or oversize the valve in relation to demand.
5.
Protect from freezing.
6. ASSE Standard 1020 requires that the atmospheric vent valve
remains open until the valve body pressure exceeds 1lb. Until this
pressure is reached, some amount of spillage will occur at the at-
mospheric vent. In order to minimize this leakage on startup close
the downstream shutoff valve and open inlet valve quickly.
Installation Requirements
Outlet Drain Valve
Flow
Sprinkler System
Piping
12" (300mm) Minimum Clearance
Above the highest Point of
Downstream Piping.
Main Shutoff Valve
Upstream (Inlet) Drain
Valve Pit
Union
WARNING
!
Read this Manual BEFORE using this equipment.
Failure to read and follow all safety and use information can
result in death, serious personal injury, property damage, or
damage to the equipment.
Keep this Manual for future reference.
You are required to consult the local building and plumbing
codes prior to installation. If the information in this manual
is not consistent with local building or plumbing codes,
the local codes should be followed. Inquire with governing
authorities for additional local requirements.
WARNING
!
Need for Periodic Inspection/Maintenance: This product must
be tested periodically in compliance with local codes, but at least
once per year or more as service conditions warrant. If installed on
a fire suppression system, all mechanical checks, such as alarms
and backflow preventers, should be flow tested and inspected in
accordance with NFPA 13 and/or NFPA 25. All products must be
retested once maintenance has been performed. Corrosive water
conditions, and/or unauthorized adjustments or repair could render
the product ineffective for the service intended. Regular checking
and cleaning of the product’s internal components helps assure
maximum life and proper product function.
WARNING
!
** Metric Dimensions are nominal pipe diameter. This product is
produced with NPT threaded end connections.