beautypg.com

Step 5: complete the case, Next steps – Dako Artisan™ Link Pro User Manual

Page 26

background image

18

Dako Artisan™ Link

|

Basic User Guide

Step 5: Complete the Case

The next step is to complete your work and create a record for each slide in the database.

Note:

The

Case complete button will not be active until all labels are printed. The button

turns green when all labels are printed.

Note:

If you select one of the other “tabs” in the DakoLink before you completed the case,

you may receive a warning depending on the general preferences you have set.

1. Click

Case complete to save your work and create the slide records in the database.

IMPORTANT

You must click the

Case complete button to send the slides

to the

Workflow tab and before you place the slides onto a stainer.

Next Steps

You have now completed the case. Before you start the run, you can add additional cases by

repeating the tasks described in Steps 1 through 4 above.

You can continue to add cases on an ongoing basis even while slides are undergoing staining on one

or more stainers. The cases you add are not bound to any particular run, so you can add a whole

day’s work at the beginning of the day and then decide which slides you want to run together.

Follow these guidelines before you place the labeled slides on the stainer:

Manually Dry and Deparaffinize:

1. Deparaffinize your slides according to your laboratory procedure.
2. Place hydrated slides in the Wash Solution for 5-10 minutes before loading onto the

instrument.

On Board Drying and Deparaffinize:

1. Allow slides to drain all excess water and air dry approximately 15 minutes before loading

onto the instrument.