Prepare wash buffer, Prepare standards and controls, Prepare wash buffer 11 – Bio-Rad Bio-Plex Pro™ Human Isotyping Assays User Manual
Page 13: Prepare standards and controls 11, Setting up a vacuum manifold, General instructions, Using the quality controls (optional)

11
Setting up a Vacuum Manifold
Calibrate the vacuum manifold by placing a standard 96-well flat bottom
plate on the unit and adjusting the pressure to –1 to –3" Hg. In general,
100 µl liquid should take 3–4 sec to clear the well. For more detailed
instructions, refer to bulletin #10005042.
4. Prepare Wash Buffer
1. Bring the 10x stock solution to room temperature.
2. If crystals exist, ensure that they are completely dissolved. Mix the
10x stock solution by inversion before preparing the 1x wash buffer.
3. To prepare 1x wash buffer, dilute 1 part of 10x stock solution with
9 parts of deionized water.
5. Prepare Standards and Controls
General Instructions
n
It is essential to prepare standards and quality controls exactly as
described in this section. Incorrect preparation may lead to low signal or
variable measurements from plate to plate
n
The product data sheet provided lists the most concentrated point on the
standard curve (S1). Enter the values and units into Bio-Plex Manager
™
software as instructed in section 9
Using the Quality Controls (optional)
one vial of quality controls is included. Its use is intended for monitoring
the day-to-day quality of assay results.