Hitch assembly, Hose routing hitch, Hitch assembly hose routing hitch – Great Plains 4000TM Predelivery Manual User Manual
Page 15

Great Plains Manufacturing, Inc.
Assembly
11
03/19/2014
586-537Q
Hitch Assembly
Refer to Figure 9
34. Remove the 1 1/4 x 8 Gr. 8 bolts
from the rear of hitch
assembly
. Bolt the hitch assembly
to center frame
with the 1 1/4 x 8 Gr. 8 bolts
, 1 1/4 flat washer
(one
side of uniball to take up space) and 1 1/4 top lock nuts.
Tighten bolts snug, do not torque, as the hitch must pivot
freely.
35. Install jack
on front outside of hitch to support the front
of hitch
for the rest of assembly.
36. Remove 1 1/4 x 8 1/2 Gr. 8 special thread bolt
from
front short level bar tube
. Align holes in rear of level
bar tube
and center hole of h-bracket
. Install the 1
1/4 x 8 1/2 Gr. 8 special thread bolt
from the left side
and secure with 1 1/4 top lock nut.
37. Bolt the spring hose holder
to welded nut on front of
hitch with 1/2 x 1 Gr. 5 bolt
, 1/2 flat washer and 1/2
lock washer.
38. The front of the level turnbuckle
may need attached to
ears on hitch assembly
with 1 x 6 hex bolt
and 1
top lock nut
39. Bolts may be tightened to specs, See “Torque Values
Hose Routing Hitch
Refer to Figure 10
40. Route hydraulic hoses
from valves
, on center brace
bar, under manual pak bracket
, under front of hitch
turnbuckle
along all hose clamp blocks and through
spring hose holder loop
to front of hitch
as shown.
Secure hoses with hose clamps
, 5/16 hex bolts and 5/
16 lock washers.
41. The light Harness will need routed with hydraulic hoses
along hitch. Be sure all bolts are tight.
Figure 9
Hitch
42388
3
4
1
6
2
8
9
7
5
U
D
F
B
L
R
3
10
11
2
1
1
2
3
4
1
5
6
6
7
5
8
9
10
1
11
Figure 10
Hose Routing Hitch
42945
5
7
2
4
3
2
1
6
1
2
3
4
5
6
7