Great Plains 3S-3000HDF Operator Manual v2 User Manual
Page 3

Great Plains Manufacturing, Inc.
iii
2014-02-11
195-068M
©
Copyright 12006, 2007, 2008, 2009, 2010, 2012, 2014 All rights Reserved
Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as
it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.
Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.
Registered Trademarks of Great Plains Manufacturing, Inc. include:
Air-Pro, Clear-Shot, Discovator, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand,
Terra-Guard, Turbo-Chisel, Turbo-Chopper, Turbo Max, Turbo-Till, Ultra-Till, Verti-Till, Whirlfilter, Yield-Pro.
Brand and Product Names that appear and are owned by others are trademarks of their respective owners.
Printed in the United States of America
Table of Contents
Important Safety Information ......................................1
Safety Decals .................................................................6
Introduction ................................................................12
Document Family .........................................................12
Description of Unit ........................................................12
Using This Manual........................................................13
Definitions.................................................................13
Owner Assistance ........................................................14
Preparation and Setup ...............................................15
Pre-Setup Checklist......................................................15
Hitching ........................................................................15
Electrical Connections..................................................17
Hydraulic Hose Hookup................................................18
Check Drill Level ..........................................................19
Setting the Bypass Valve .............................................20
Operating Instructions...............................................22
General Description......................................................22
Pre-Start Checklist .......................................................23
Raising and Lowering Openers ....................................23
Opener Lock Up .......................................................23
Lock Up Openers..................................................23
Unlock Openers....................................................24
Folding..........................................................................24
Raising Drill (Transport Lift)..........................................25
Transport Lift ............................................................26
Transport ......................................................................26
Lowering Drill (Transport Lift) .......................................28
Transport Lower .......................................................28
Unfolding ......................................................................29
Folding and Unfolding Quick Reference...................30
Opener Operation.........................................................31
Active Hydraulic Systems .........................................32
Priority Flow Hydraulic Systems ...............................33
Non-Active Hydraulic System ...................................33
Position Seed Cup Doors .........................................34
Loading Seed Boxes ....................................................34
Main Seed Box Loading ...........................................35
Fertilizer Box Operation ............................................... 36
Seeding and applying fertilizer ................................. 36
Initial Seeding Depth ................................................ 39
Acremeter Operation.................................................... 40
Normal Operating Sequence.................................... 40
Dormant Display................................................... 41
Marker Operation ......................................................... 42
Lift Selector Valve Operation ....................................... 43
Point Row Operation .................................................... 43
Shaft Monitor Operation ............................................... 44
Field Operations........................................................... 44
Planting Speed ..................................................... 44
Parking......................................................................... 45
Storage ........................................................................ 46
Adjustments ............................................................... 47
Setting Material Rates.................................................. 48
Setting Main Box Seed Rate .................................... 48
Calibration ............................................................ 48
Frame Level ................................................................. 49
Frame Weight .............................................................. 50
Opener Frame Down-Force ......................................... 50
Setting Hydraulic Down-Pressure ............................ 52
Opener-Subframe Adjustment ..................................... 53
Row Unit Adjustments.................................................. 54
Opener Height.......................................................... 55
Row Unit Down Pressure (Spring) ........................... 55
Disk Blade Adjustments ........................................... 56
Adjusting Disc Contact ......................................... 56
Disk Scraper Adjustments........................................ 56
Seed Firmer Adjustments......................................... 57