Great Plains NP4000B Operator Manual User Manual
Page 87

Great Plains Manufacturing, Inc.
Operating Instructions
83
2014-05-14
417-199M
Suspending Application Checklist
Page
1
Liq: Set hydraulic pump circuit to Float.
2
Set console MASTER switch OFF
69
3
NH
3
: Continue application until flow
divider pressure is 0
69
4
NH
3
: Turn into the wind
-
5
NH
3
: Stop tractor, with tines in ground
69
6
Liq: Stop tractor, with applicator raised or
left lowered.
Ending Application Checklist
Page
1
Liq: Plan final passes to avoid complete
run-out.
2
Suspend application as above.
3
NH
3
: Put on your goggles and gloves
-
4
NH
3
: Close nurse tank withdrawal valve
70
5
NH
3
: Re-enter cab. Turn MASTER switch
ON
-
6
NH
3
: Resume field application.
Raise flow rate to maximum.
70
7
NH
3
: Continue application until cooler and
flow divider pressures are zero.
-
8
NH
3
: Turn into wind.
-
9
NH
3
: Raise applicator and stop.
10 NH
3
: Set MASTER switch off.
-
11 NH
3
: Wait one minute.
-
12 NH
3
: Turn left (wind from right). Stop.
-
13 NH
3
: Open all bleed valves.
70
14 NH
3
: Close all line valves.
70
15 NH
3
: Wait one hour.
70
16 Liq: Apply excess fertilizer (leaving some)
to the final field.
17 Liq: Refill tank with clean water.
18 Liq: Set application rate to maximum.
19 Liq: Apply water to final field / flush
system.
20 Liq: Close all shut-off valves at
tank/applicator connections.
21 NH
3
: Safe and unhitch nurse tank.
Liq: Unhitch nurse tank (if used)