Mount sequence valve, Install hoses, Prepare existing fold hitch hoses – Great Plains 3S-5000HDF Assembly Instructions User Manual
Page 10: Remove hose handles, Pull a fish line, Rb r b
10
Great Plains Manufacturing, Inc.
3S-5000/F/HD/HDF Markers
113-890M
2013-04-09
Mount Sequence Valve
Refer to Figure 16
43. Select the configured:
810-422C VALVE,SEQ SHOEMAKER HI FLO
and two sets new:
802-014C HHCS 3/8-16X3/4 GR5
804-013C WASHER LOCK SPRING 3/8 PLT
Locate the mount bracket
tongue. Orient the sequence valve with ports 1 and 2
facing forward and the tapped
3
⁄
8
-16 holes facing
down. Secure the valve to the mount with the
bolts
and lock washers
. Tighten only to
Grade 2 torque.
Install Hoses
Prepare Existing Fold Hitch Hoses
Remove Hose Handles
Refer to Figure 17
44. Locate the existing fold circuit hoses
.
These have gray hose handles (
and
).
Mark each hose as Base/Extend
or
Rod/Retract
, based on the symbols on the hose
handles.
45. Remove and save one set each:
Pull a Fish Line
46. Connect a strong fish line to one of the existing fold
hoses. Pull the hose and line from the rear end of the
tongue.
184
U
D
F
B
L
R
7
165
141
Figure 16
Mount Sequence Valve
34781
184
141
165
7
141
165
Extend
Retr
act
R
B
Figure 17
Remove Hose Handles
34784