Great Plains 3S-5000HDF Assembly Instructions User Manual
General information, Installation instructions, Tools required
Great Plains Manufacturing, Inc.
1
Printed 2013-04-09
113-890M
Installation Instructions
3S-5000/F/HD/HDF Markers
Used with Drill models:
• 3S-5000 3-Section 50-Foot Drill
• 3S-5000F 3-Section 50-Foot Fertilizer Drill
• 3S-5000HD 3-Section 50-Foot Heavy Duty Drill
• 3S-5000HDF 3-Section 50-Foot HD Fertilizer Drill
General Information
Refer to Figure 1
These instructions explain how to install field markers.
One kit outfits one drill.
Tools Required:
• lift or hoist with a capacity of 700 pounds (320 kg);
• work stands or saw horses with 700 pounds (320 kg)
capacities (each);
• fishline;
• bucket for draining existing hydraulic hoses;
• 5 gallons (18 liters) hydraulic fluid;
• tractor or hydraulic source;
• general purpose grease;
• current Operator and Parts manuals; and,
• basic hand tools.
Notations and Conventions
Definitions
The following terms are used throughout this manual.
Note: Paragraphs in this format provide useful
information related to the current topic.
Right-hand and left-hand as used in
this manual are determined by facing
the direction the machine will travel
while in use unless otherwise stated.
An orientation rose (right) depicts Up,
Right, Back, Down, Left and Front.
Some roses (as in Figure 1) have
legends “I” (to Inboard/Inside) and “O”
(to Outboard/Outside) instead of L and R.
Call-Outs
Related Documents
Kit
Kit Description
113-896A MARKER, 3S-5000 DUAL
When you see this symbol, the subsequent instructions
and warnings are serious - follow without exception.
Your life and the lives of others depend on it!
Figure 1
LH Marker Assembled
34762
U
D
F
B
O
I
U
D
L
R
B
F
to
Single-digit callouts identify components in
the currently referenced Figure. These
numbers may be reused for different items
from page to page.
to
Two-digit callouts in the range 11 to 14
reference existing parts from the list on
page 23.
to
Tthree-digit callouts in the range 100 to 199
reference new parts.
195-325M
3S-5000 Operator manual
195-325P
3S-5000 Parts manual
1
9
11
14
100
199
Document Outline
- Installation Instructions
- General Information
- Prepare the Drill
- General Installation Notes
- Install Transport Rests
- Install Mounts & 1st Sections
- Install Second Sections
- Install Third Sections
- Install Valves
- Install Hoses
- Charge and Bleed
- Test Marker Function
- Install Disc Assemblies
- Set Marker Extension
- Adjust Marker Speed
- Close-Out
- Appendix