Meter slide maintenance, Replacing meter slide, Meter slide maintenance replacing meter slide – Great Plains 2525P Operator Manual User Manual
Page 68

64
2020P/2025P and 2520P/2525P
Great Plains Manufacturing, Inc.
118-231M
2013-05-10
Meter Slide Maintenance
(Singulator Plus meters only)
For proper seeding operation, seasonally or when
changing crops, check meter slide for wear. If you have
a noticeable increase in seeding rate you may need to
replace the meter slide.
1.
If seed box is not empty, shut off sliding seed tubes.
See “Row Unit Shutoff” on page 32.
2.
Clean out seed meter. See “Cleaning Out Meters”
on page 63.
3.
Remove wheel. See “Seed Meter Setup and
Adjustment” on page 39.
Refer to Figure 83
The slide
is located at the front of the meter (left side
on 20 Series depicted; right side on 25 Series).
4.
Check for excess wear on meter slide
. Slight
wear at the top corner is normal.
5.
If slide is not excessively worn, stop here. If it is,
continue with step 6 to replace.
Replacing Meter Slide
Refer to Figure 84
6.
Remove retaining clip and pin
from meter.
Note: Meter slide
is spring loaded. Two meter slide
springs
will be released when you pull the pin,
and a third
when you tilt it back. Use care not to
lose pins and springs.
7.
Check removed pin
for wear and replace if worn.
8.
Place springs in new meter slide. Insert in meter
and pin in place.
9.
Re-install meter wheel (page 40).
10. Close and pin meter clean-out (page 63).
11. Re-open seed tube sliding gate if closed (page 32).
Figure 83
Singulator Meter Slide
18269
1
1
1
Figure 84
Meter Slide Replacement
26220
3
4
5
2
2
3
4
5
2