beautypg.com

Pre-transport checklist – Great Plains CTA4000 Operator Manual User Manual

Page 27

background image

Operating Instructions 23

08/03/2010

160-269M-A

Pre-Transport Checklist

Before transporting the cart, check and observe the fol-
lowing items.
❑ Make sure the weight of the tractor equals or exceeds

the value specified for your air implement assembly.

Air Cart Checklist Complete

Including: cart drive chain locked-out, auger latched,
hopper lids secured, ladders latched up.

Marker Checklist Complete

Markers must be folded or retracted, and may have
transport locks or other transport considerations.

Implement Raised and Locked

Wings locked.
Transport/Field valve handle set to TRANS.

Tires

Check that all tires are properly inflated as listed on
Tire Inflation Chart” on page 55.

Bystanders

Check that no one is in the way before moving. Do not
allow any one to ride on the cart or implement.

Warning Lights

Always use tractor, cart and implement warning lights
when transporting the air implement.

Clearance

Know the maximum dimensions of the cart and imple-
ment in transport position and follow a route that pro-
vides adequate clearance from all obstructions,
including overhead lines.
See “Specifications and Capacities” on page 55.

Stopping Distance

Allow sufficient stopping distance and reduce speed
prior to any turns or maneuvers. If the cart is trans-
ported full, allow extra stopping distance.

Road Rules

Comply with all national, regional and local laws when
transporting on public roads.

Watch Traffic

The hoppers and implement wings obstruct a portion
of your rear view. Be prepared for sudden maneuvers
from following vehicles.

Figure 22

Review Transport Checklist

26360