Preparation and setup, Post-delivery/seasonal setup, Pre-planting setup – Great Plains 3S-5000HDF Operator Manual User Manual
Page 19
2012-08-14
195-325M
Great Plains Manufacturing, Inc.
Preparation and Setup
15
Preparation and Setup
This section helps you prepare your tractor and
3S-5000/F/HD/HDF Drill for use.You must level the drill,
adjust drill tongue height to match your tractor drawbar
height, hook up the drill hydraulics to the tractor, and
check that the hydraulics have been bled.
Post-Delivery/Seasonal Setup
On initial delivery, use with a new tractor, and seasonally,
check and as necessary, complete these items before
continuing to the routine setup items:
• Bleed hydraulic system (page 60).
• Wing leveling and alignment (page 17).
• Marker setup (page 37)
• De-grease exposed cylinder rods if so protected at last
storage.
Pre-Planting Setup
Complete this checklist before routine setup:
❑ Read and understand “Important Safety
❑ Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
❑ Check that all grease fittings are in place and
lubricated. See “Lubrication” on page 68.
❑ Check that all safety decals and reflectors are
correctly located and legible. Replace if damaged.
See “Safety Decals” on page 6.
❑ Inflate tires to pressure recommended and tighten
wheel bolts as specified. See “Specifications and
Capacities” on page 79.