STEP 4:  IF LOCAL CODE REQUIRES THE USE OF 
CABLES/WIRES TO SECURE THE LUMINAIRE TO BUILDING 
STRUCTURE, USE THE 4 HOLES ON THE ADJACENT TO THE 
EARTHQUAKE CLIPS. 

 

 

 

 

 

STEP 5: REMOVE THE JUNCTION BOX COVER TO ACCESS THE 
WHITE AND BLACK LEADS ON THE RIGHT HAND SIDE OF THE 
JUNCTION BOX. 

 

 

 

 

 

JUNCTION BOX SIDE FOR PRIMARY POWER CONNECTION 

STEP 6:  REMOVE THE DESIRED TRADE SIZE KNOCK OUT AND 
CONNECT THE LINE POWER CONDUIT CABLES AS SHOWN IN 
WIRING DIAGRAM BELOW.  RE‐INSTALL THE JUNCTION BOX 
COVER.

 

 

GREEN‐GROUND 

WHITE‐NEUTRAL 

BLACK‐HOT 

PURPLE‐0‐10V DIMMING CONTROL (+) 

GREY‐0‐10V DIMMING CONTROL (‐)   

                                                                                                        

STEP 7:  IF DIMMING IS REQUIRED. REMOVE THE LEFT HAND 
JUNCTION BOX COVER AND CONNECT THE 0‐10V DIMMING 
WIRES AS SHOWN IN THE BELOW WIRING DIAGRAM.  
PURPLE AND GREY WIRES WILL BE CAPPED OFF.  DO NOT 
REMOVE CAPS IF THEY WILL NOT BE CONNECTED TO A 
DIMMING SYSTEM. 

 

JUNCTION BOX SIDE FOR CONNECTING 0‐10V DIMMING 
LEADS 

STEP 8:  AFTER CONNECTING DIMMING LEADS RE‐INSTALL 
THE JUNCTION BOX COVER. 

 