OSRAM SYLVANIA RLC22 LED 2x2 Fixture User Manual
Page 2
![background image](/manuals/596621/2/background.png)
STEP 4: IF LOCAL CODE REQUIRES THE USE OF
CABLES/WIRES TO SECURE THE LUMINAIRE TO BUILDING
STRUCTURE, USE THE 4 HOLES ON THE ADJACENT TO THE
EARTHQUAKE CLIPS.
STEP 5: REMOVE THE JUNCTION BOX COVER TO ACCESS THE
WHITE AND BLACK LEADS ON THE RIGHT HAND SIDE OF THE
JUNCTION BOX.
JUNCTION BOX SIDE FOR PRIMARY POWER CONNECTION
STEP 6: REMOVE THE DESIRED TRADE SIZE KNOCK OUT AND
CONNECT THE LINE POWER CONDUIT CABLES AS SHOWN IN
WIRING DIAGRAM BELOW. RE‐INSTALL THE JUNCTION BOX
COVER.
GREEN‐GROUND
WHITE‐NEUTRAL
BLACK‐HOT
PURPLE‐0‐10V DIMMING CONTROL (+)
GREY‐0‐10V DIMMING CONTROL (‐)
STEP 7: IF DIMMING IS REQUIRED. REMOVE THE LEFT HAND
JUNCTION BOX COVER AND CONNECT THE 0‐10V DIMMING
WIRES AS SHOWN IN THE BELOW WIRING DIAGRAM.
PURPLE AND GREY WIRES WILL BE CAPPED OFF. DO NOT
REMOVE CAPS IF THEY WILL NOT BE CONNECTED TO A
DIMMING SYSTEM.
JUNCTION BOX SIDE FOR CONNECTING 0‐10V DIMMING
LEADS
STEP 8: AFTER CONNECTING DIMMING LEADS RE‐INSTALL
THE JUNCTION BOX COVER.
SYLVANIA is a registered trademark of OSRAM SYLVANIA INC.
Specifications subject to change without notice