beautypg.com

Exide Technologies V19CIL5200ULF User Manual

Page 5

background image

Sales

Service

Recycling 888.563.6300 in the USA 800.268.2698 in Canada

4

inside, it is recommended you use a long handle hexagon key or screwdriver with
the hexagon key inserted. This will allow you to go through the base plate to the
bolts, which are located on the flange.


b) Remove the bolts from the top cover of the base unit, but do not discard these,

as they will be required to fix the two units together.

c) Use an appropriate lifting sling to lift the second unit on to the base unit, inch the

second unit over the base unit and align the holes before resting the second unit
on top.


d) Secure the two units together using the bolts removed from the top cover of the

base unit. Use the access between the two units or inside the second unit using
the tools as recommended above.

e) If stacking three high, use the above procedure for stacking the third unit.



WARNING: THESE PROCEDURES MUST BE FOLLOWED EXACTLY TO AVOID

INJURY OR RISK OF ELECTRIC SHOCK.


WARNING: TO REDUCE THE RISK OF FIRE, INSTALL BATTERY CHARGER ON A

FLOOR OF NON-COMBUSTIBLE MATERIAL SUCH AS STONE, BRICK,
CONCRETE OR METAL. IF THIS IS NOT AVAILABLE, A FLOOR
PLATE OF AT LEAST 1.43mm GALVANIZED OR 1.6mm UNCOATED
STEEL EXTENDED AT LEAST 150mm BEYOND THE EQUIPMENT ON
ALL SIDES MUST BE INSTALLED.