Figure 14. inside the ac connector, Figure 15. line - neutral - ground connections – Unitec Portal Installation Manual User Manual
Page 23
P O R T A L T I
Portal Installation Manual Rev C
19
Figure 14. Inside the AC Connector
5. Remove the screw holding the stabilizer plate in place and set both aside until
after you have finished securing the wires.
6. Thread the power wires through the strain relief.
7. Remove the white stabilizer plate.
8. Secure the Line (Black), Neutral (White) and Ground (Green) wires to the
appropriate terminal screws. (See Figure 23). Re-tighten the screws to hold
the wires in place.
Figure 15. Line - Neutral - Ground Connections
9. Re-assemble the AC connector and insert it into the power inlet. Use wire
ties to route and secure the extra cable.
Document #: PTL1001