Installation

9. Set the “Process Selection Switch” to GTAW (Lift

TIG)

10. Set the weld current control knob to the desired

amperage.

11. The tungsten must be ground to a blunt point in order

to achieve optimum welding results. It is critical

to grind the tungsten electrode in the direction the

grinding wheel is turning.

12. Install the tungsten with approximately 1/8” to ¼”

sticking out from the gas cup, ensuring you have

correct sized collet.

13. Tighten the back cap.
14. You are now ready to begin TIG Welding

NOTE

Open the gas valve on TIG torch handle, and adjust

the pressure of regulator to 15-25 cubic feet per hour.

This gas flow should be sufficient for most TIG welding

applications.
ii. Touch the tungsten to the work piece. This closes the

welding circuit, and the arc starts by slowly LIFTING the

torch off the base metal. Keep a consistent arc length

of about 1/8-1/4”.
iii. If necessary re-adjust the amperage setting to an