beautypg.com

General and commercial installation checklist – Watts PWSTA 90-120K User Manual

Page 5

background image

5

General and Commercial

Installation Checklist

1 . Place the softener tanks where you want to install the unit .
NOTE: Be sure the tanks are level and on a firm base.
2 . During cold weather it is recommended that the installer warm

the valve to room temperature before operating .

3 . Perform all plumbing according to local plumbing codes .
— Use a 1/2" minimum pipe size for the drain .
— Use a 3/4" drain line for backwash flow rates that exceed 7

gpm or length that exceeds 20' (6 m) .

4 . Both tanks must be the same height and diameter and filled with

equal amounts of media .*

5 . The distributor tube must be flush with the top of each tank . Cut

if necessary . Use only non-aerosol silicone lubricant .*

6 . Lubricate the distributor O-ring seal and tank O-ring seal . Place

the main control valve on one tank and the tank adapter on the

second tank .*

NOTE: If required, solder copper tubing for tank intercon-

nection before assembling on the main control valve and

tank adapter. Maintain a minimum of 1" distance between

tanks on final assembly.

7 . Solder joints near the drain must be done before connecting

the Drain Line Flow Control fitting (DLFC) . Leave at least 6" (152

mm) between the DLFC and solder joints when soldering pipes

that are connected on the DLFC . Failure to do this could cause

interior damage to DLFC .

8 . Use only Teflon

®

tape on the drain fitting .

9 . Be sure the floor under the salt storage tank is clean, level, and

strong enough to support the system . .

10 . Place approximately 1" (25 mm) of water above the grid plate . If

a grid is not utilized, fill to the top of the air check in the salt tank .

Do not add salt to the brine tank at this time .

11 . Place the system in Bypass .
— Turn on the main water supply .
— Open a cold soft water tap nearby and let water run a few

minutes or until the system is free of foreign material (usually

solder) resulting from the installation .

12 . Place the bypass In Service position and let water flow into the

mineral tank .

Electrical
13 . Make all electrical connections according to codes . Plug the

valve into an approved power source . Do not insert meter cable

into the meter yet .

14 . Tank one has control valve and tank two has adapter . See Figure

1, page 4 .

15 . Look on the right side of the control valve, it has indicators

showing which position the control valve is in during Regenera-

tion and which tank is In Service .

— Figure 3, page 6 shows the valve In Service position with tank

one supplying conditioned water and tank two on standby .

NOTE: Make sure the meter cable is not inserted in the me-

ter dome. Swing the timer out to expose the program wheel.

To swing timer out, grab onto the lower right corner of timer

face and pull outward. See Figure 5, page 7.

* Tanks 12" in diameter and smaller are factory loaded with me-

dia. Checking media amounts, distributor tube length, lubricat-

ing the distributor pilot O-rings, and lubricating the tank seal

O-rings on these sized systems is not necessary.

Teflon

®

is a registered trademark of E .I . Dupont de Nemours & Company .

This manual is related to the following products: