MODEL 2900s

General Commercial Pre-Installation Check List

WATER PRESSURE: A minimum of 20 pounds of water pressure is required for regeneration valve to operate effectively.

ELECTRICAL FACILITIES: A continuous 110 volt, 60 Hertz current supply is required. Make certain the current supply is
always hot and cannot be turned off with another switch.

EXISTING PLUMBING: Condition of existing plumbing should be free from lime and iron buildup. Piping that is built up
heavily with lime and/or iron should be replaced. If piping is clogged with iron, a separate iron filter unit should be installed ahead
of the water softener.

LOCATION OF SOFTENER AND DRAIN: The softener should be located close to a drain.

BY-PASS VALVES: Always provide for the installation of a by-pass valve.

CAUTION: Water pressure is not to exceed 120 p.s.i., water temperature is not to exceed 100

° F, and the unit cannot be subjected

to freezing conditions.

Installation Instructions

1. Place the softener tank where you want to install the unit making sure the unit is level and on a firm base.

2. All plumbing should be done in accordance with local plumbing codes. The pipe size for the drain line should be the same size

as the drain line flow control female connection. Water meters are to be installed on soft water outlets. Twin units with (1) one
meter shall be installed on common soft water outlet of units.

3. Solder joints near the drain must be done prior to connecting the Drain Line Flow Control fitting. Leave at least 6” between the

DLFC and solder joints when soldering when the pipes are connected on the DLFC. Failure to do this could cause interior
damage to the DLFC.

4. Teflon tape is the only sealant to be used on the drain fitting. The drain from twin units may be run through a common line.

5. Make sure that the floor is clean beneath the salt storage tank and that it is level.

6. Place approximately 1

″ of water above the grid plate (if used) in your salt tank. Salt may be placed in the unit at this time.

7. On units with a by-pass, place in by-pass position. Turn on the main water supply. Open a cold soft water tap nearby and let

run a few minutes or until the system is free from foreign material (usually solder) that may have resulted from the installation.

8. Place the by-pass in service position.

9. Manually index the softener control into “service” position and let water flow into the mineral tank. When water flow stops,

open a cold water tap nearby and let run until air pressure is relieved.

10. Electrical: All electrical connections must be connected according to codes. Use electrical conduit if applicable. Remote meter

systems and Twin meter system wiring diagrams can be found at the back of the service manual.

11. Plug into power supply.