6.2.3 Special beaker definition
Under
Configuration
mark
815_1
, select
Edit / Properties / Rack / Rack data / Special beaker
,
Special beaker 1
, click
on
Edit
and define the position to be used for rinsing as
Rack position
. The last position is normally used
as the rinsing position. A sample vessel containing DI water should always stand in this position.
Confirm by clicking on
twice.
6.2.4 Lift
positions
Under
Configuration / Tools / Manual operation
click on
815 Sample Changer / Tower 1
in the left-hand column
and use the entries
Move
and
Assign position
(See 815 Instructions for Use, page 47) to define suitable
values (click on
each time) for:
Shift position
for changing the rack position (approx. 53 mm)
Work position
for aspirating of the sample (approx. 173 mm)
Special position
for dipping for the conductivity measurement (approx. 130 mm)
For the special position you must define the work position again, then at the right beside
Work position
click on
Tower
and select
Special position 1
. Confirm these settings with a click on
close
.
6.2.5 Solutions
The solutions to be used must, as usual, be defined in tiamo. Connect the Dosino of the 50 mL Dosing
Unit to MSB 1 of the 809, the Dosino of the 20 mL Dosing Unit (HCl) to MSB 2 of the 809, the Dosino of
the 10 mL Dosing Unit (EDTA) to MSB 3 of the 809 and the Dosino of the 20 mL Dosing Unit (Auxiliary
complexing solution) to MSB 4 of the 809. The user is automatically requested to save the solutions –
click on
. In order to ensure compatibility with the methods provided, they must be named as
described below.
At the left click on
Configuration
, then at the top right under
Titrants / Solutions
double-click on the
appropriate (empty) entries and enter the following under
Solution name
and
Concentration
:
Configuration table for titrants / solutions
Now the tubing lengths and ports are defined for each Dosing Unit under
Edit / Properties…/ Dosing unit
as
follows:
anion
HCl
EDTA
Auxiliary complexing sol
Port
Length Port Length Port Length Port Length
Dosing Port Prep/
Empty
Special
Port
-
Dosing Port 1
-
Dosing Port 1
-
Dosing Port 1
-
Dosing Port 1
Port 4
60 cm
Port 1
40 cm
Port 1
40 cm
Port 1
40 cm
Dosing Port 2
Port 3
0 cm
Port 3
0 cm
Port 3
0 cm
Port 3
0 cm
Fill Port
Port 2
80 cm
Port 2
25cm
Port 2
25 cm
Port 2
25 cm
Special Port
Port 1
0 cm
Port 4
0 cm
Port 4
0 cm
Port 4
0 cm
Configuration table of the four Dosing Units