beautypg.com

Metrohm 860 KF Thermoprep User Manual

Page 29

background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

860 KF Thermoprep

■■■■■■■■

21

5 Shift the height of the tip of the heating tube vertically in such a way

that the outlet opening of the tubing is immersed as deeply as possi-
ble. The tip must not however be permitted to get in the way of the
stirring bar in the KF titration cell. Afterwards give the septum stop-
per its final tightening.