beautypg.com

Figure 15, Mounting the tubings – Metrohm 860 KF Thermoprep User Manual

Page 25

background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

860 KF Thermoprep

■■■■■■■■

17

2 Screw one 6.1821.040 filter tube into each of the 6.1602.145

drying flask covers from below. Tighten the filter tubes well by
hand.

3 Screw the two drying flask covers with the filter tubes onto the dry-

ing flasks. Tighten the covers well by hand.

Note

If drying flask covers or filter tubes are not sufficiently tightly
screwed on, then this will prevent a precise, regular flow of gas.
The error message "Flow rate error" will appear as a rule when
there are leaks in the threaded connections.

1

1

3

2

4

6.1805.080

6.1805.080

6.1805.010

2

3

Figure 15

Mounting the tubings

Mount the FEP tubings as follows:

1 Load the two drying flasks that have been prepared into the holders,

see illustration.

2 Screw one 6.1805.080 FEP tubing (25 cm length) to the gas outlet

(at the front, labeled 1). Screw the other tubing end on the front dry-
ing flask to the M6 connector without point marking (see left-hand
arrow).