GRADE/SLOPE
Back-Fill on a Slope —
Percent of Grade Known
You’ve built 55 linear feet of a 3-foot high retaining wall that is 3 feet
from the base of a 65% grade. You need to pour back-fill within 12
inches of the top of the wall (for a 2 foot depth). How many cubic
yards of fill should you have delivered?
KEYSTROKE
DISPLAY
1. Find volume for “A”:
o o
0.
5 5 f
55
FEET
x 3 f
3
FEET
x 2 f = µ
M+ 330.
CU FEET
2. Find run/diagonal of “B”:
6 5 % p
%GRD 65.
2 f r
RISE 2
FEET
0
INCH
R
RUN 3
FEET
0-15/16
INCH
3. Find volume of triangle “B”:
5 5 f
55
FEET
x ® R
RUN 3
FEET
0-15/16
INCH
x 2 f =
338.4615
CU FEET
÷ 2 = µ
M+ 169.2308
CU FEET
4. Find total volume:
® ®
M+ 499.2308
CU FEET
Ç y
18.49003
CU YD