beautypg.com

Chapter 2 installation, Portability, Installing battery – Bird Technologies 4412A User Manual

Page 15: Figure 2 battery installment, Portability installing battery

background image

5

Chapter 2

Installation

Portability

When transporting the wattmeter, be sure the range switch is in the “off” posi-
tion. In any other switch position, there is a slight drain on the 9 V battery. If the
unit is to be inactive for more than 2 weeks, remove the battery to avoid dam-
age from possible battery leakage.

Handle the plug-in elements with care at all times. Calibration could be dis-
turbed if they are dropped or subjected to hard blows.

Installing Battery

The 9 V battery is shipped separately and must be installed before operation.

Refer to figure 2 for battery location.

Figure 2 Battery Installment

Battery Access

Door

This manual is related to the following products: