beautypg.com

Chapter 3 installation, Unpacking and inspection, Setup – Bird Technologies 8921SC13-Manual User Manual

Page 15: Mounting, Installation, Unpacking and inspection setup mounting

background image

5

Chapter 3

Installation

This chapter provides information for on-site requirements,
unpacking, inspection, and preparing the load for use.

Unpacking and

Inspection

1. Carefully inspect the shipping container for signs of damage. If

damage is noticed, do not unpack the unit. Immediately notify the
shipping carrier and Bird Electronic Corporation.

2. If the container is not damaged, unpack the unit. Save the packing

materials in case the unit should need to be shipped again.

3. Inspect all of the components for visible signs of damage.

Immediately notify the shipping carrier and Bird Electronic
Corporation of equipment damage or missing parts.

Setup

"

Before first using the load, get a resistance baseline for future
maintenance. Refer to “DC Resistance” on page 12 for details.

"

Remove both shipping plugs from the load and replace them

with the vent plugs. Refer to Figure 2 and Figure 3 for pictures

of the plugs.

Mounting

Place the load in a dry, dust and vibration free environment. Do not
use outdoors or in areas of condensing humidity. Allow at least 12"
(30 cm) of clearance on all sides of the load.

The load is equipped for either portable use or fixed installation. The
mounting brackets on the front and rear faces have four mounting
slots arranged in a 4

1

2

" x 14

7

32

" rectangle (114.3 x 361.2 mm). Use a

screw with a

3

8

" (9.53 mm) diameter max.

WARNING

BOTH vent plugs must be used at all times when the unit is

operating or cooling. Failure to do so could result in an

explosion or severe burns.

CAUTION

This load is designed for operation in a horizontal position only,

with the vent plugs up. Do not use in any other manner.