Preliminary steps, Replacing the power supply – Rockwell Automation 2362 Control Fuse Replacement User Manual
Page 3
Publication 2300-5.15 March 1999
Control Fuse Replacement
3
Preliminary Steps
Before replacing the fuses, shut off the power; lockout/tagout the unit; and
wait five minutes for all voltage to discharge. Open the bay door to the
fuses.
Replacing the Power Supply
1. Using a meter, test the voltage across the AC line, across the DC bus, and
across each of the fuses to be replaced.
2. Pull out the fuses.
3. Verify that the new fuses from this kit are the same type and rating as the
fuses that removed from the unit.
4. Firmly press the new fuses into the fuseblock (the fuse rating should be
made visible).
5. Verify that the wiring to the fuseblock is in good condition and that the
terminals are secure.
Figure 1
Removing Fuses
!
ATTENTION: If there is any voltage present, remove the
source of the voltage. Check for voltages again before
proceeding to the next step.