beautypg.com

Rockwell Automation 2100 CENTERLINE MCCs Installing A Centralized Wiring Diagram Holder User Manual

Centerline, Catalog number 2400h-wdh, Instructions

background image

1

Publication 2100-IN061A-EN-P—July 2005

Instructions

CENTERLINE

®

Motor Control Centers

Installing A Centralized Wiring Diagram
Holder

Catalog Number 2400H-WDH

Application

This publication explains how and where to install a wiring diagram holder
when a centralized location is preferred for Bulletin 2100 and 2400 wiring
diagrams.

Recommended Tools

• Screwdriver
• Torque Wrench
• Ruler or Tape Measure

Installing the Wiring
Diagram Holder

1. The centralized wiring diagram holder should be located on the inside

of a bottom wireway cover, in any convenient section. Determine which
section you want to locate the centralized wiring diagram holder.
NOTE: If you motor control center has bottom fed incoming cables do
not locate the centralized wiring diagram holder in the incoming line
section.

2. Unscrew the two captive screws on the bottom wireway cover of the

selected section. Remove the wireway cover.

3. Remove the backing paper from the wireway label. Position the wireway

label, as shown in Figure 1, on the outside (front) of the wireway cover.

4. Remove the backing paper from the centralized wiring diagram holder.

position the holder, as shown in Figure 2, on the inside (back) of the
wireway cover. Push firmly, so the adhesive sticks to the wireway cover.

5. Place the wiring diagrams, shipped with the units, in the centralized

wiring diagram holder. It is not necessary to save duplication copies of
the same wiring diagram.

6. Replace the bottom wireway cover. Torque the screws to 10lb/in

(1.13N/m).