Follow these steps when installing a cable.
1.
Identify the recommended installation areas and the correct offset from features before
beginning any cable bend. Features include these areas on the cable:
•
Connectors
•
Transitions from exposed wire to insulation (for example, flying leads)
•
Exposed cable ground shields
The offset from these features should be greater than or equal to (>1x) the cable
diameter.
2.
Keep cable bends within the bend radius specified on
3.
When installing the cable observe these restrictions:
•
The bend zone is the area in which the cable can bent to its specified bend radius.
•
The installation areas require strain relief to minimize cable flexing, and to reduce
the possibility of cable fatigue where the cable connects to other components.
4.
Identify each connection on a cable by attaching a label around the outer insulation of
each wire adjacent to the drive connection.
Limited Bend Zone
Flex Restrictions Apply
2090-CFBM7E7-CDAFxx shown
Installation Area
300 mm (12 in.) approx.
Bend Radius
Refer to
for value.
Installation Area