beautypg.com

Apply power to the switch, Status indicators – Rockwell Automation 1783-US8T Stratix 2000 Ethernet Unmanaged Switch Installation Instructions User Manual

Page 13

background image

Stratix 2000 Ethernet Unmanaged Switch 13

Rockwell Automation Publication 1783-IN010A-EN-P - June 2013

Apply Power to the Switch

Once you apply power to the switch, if the ports are operating normally, the following
happens:

The port status indicators flash for a short time.

The PWR status indicator will be on continuously.

Status Indicators

Indicator

Status

Description

PWR

ON

Power is connected and operates normally

OFF

Power is not connected or operates abnormally.

SPEED (Yellow)

On

100 M working state (for example, 100Base-TX)

Off

10 M working state (for example, 10Base-T)

LINK/ACT (Green)

On

Network is available

Blinking

Network activity on the port

Off

No network activity on the port.

PWR

7

8

5

6

3

4

1

2

32309-M

1783-US8T

Speed Status Indicator

LINK/ACT Status Indicator

Power Status Indicator